
Q U I CK CH I L LE R • M N -3 6 5 80 ( RE V . 0 ) • I N ST A L LA T I ON / O PE R A TI O N /S ER V I CE M A N UA L • 5.
SITE INSTALLATION
INSTALLATION
QC2-100 Bottom View
WATER DRAINAGE
A 1" NPS drain is located under the QC2-100. Connect
the drain pipe using Teflon tape to discharge through
an indirect waste pipe into an open-site drain by
means of a 2" (51mm) air gap. Connection must be
within 10' (3m) of the unit.
NOTE: In the U.S.A., this equipment is to be
installed to comply with the Basic Plumbing
Code of the Building Officials and Co de
Administrators International, Inc. [BOCA],
and the Food Service Sanitation Manual of
the Food & Drug Administration [FDA].
15-1/2" (394mm)
Hinged Left
35-1/2" (902mm)
Hinged Right
17-5/8" (447mm)
Front
DRAINAGE
QC2-3 QC2-20 QC2-40
QC2-100
1/2
Drain
It is recommended that legs be attached to
the unit before installing drain assembly.
LEG INSTALLATION - QC2-100
1. Avoiding trolley guides and drain, carefully lift unit
off of floor with forklift just high enough to fit leg
assembly a and tools.
2. Pound feet b into frame a.
3. Align frame with holes on the bottom of the unit.
Insert screws d through nut inserts c and attach to
frame using a 3/8" socket.
4. Adjust feet accordingly to level the unit.
1
1
2
2
4
3
19mm 19mm
Item Part Description Qty.
1 5016745 Frame, Legs 2
2 FE-23822 Feet, Adjustable, Flanged 4
3 NU-24613 Nut, Insert 1/4-20 12
4 SC-25286 Screw, 1/4-20 x 3/4" Flanged Head 12
Comentarios a estos manuales