Alto-Shaam QC-40 Manual de usuario

Busca en linea o descarga Manual de usuario para Pequeños Utensilios De Cocina Alto-Shaam QC-40. #8421 QC Service Text Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir

Indice de contenidos

Pagina 2 - QUICKCHILLER SET-UP SCREEN

9.Figure 18EVAPORATOR COIL AND SENSOR LOCATION (MODELS QC3 AND QC20)COIL SENSORDEFROSTTERMINATORAIR TEMPERATURESENSORTEMPERATUREEXPANSION VALVEPRODUCT

Pagina 3 - SETTING SET POINTS

The QC40 has a split coil evaporator under the floor of the cabinet and uses 3 evaporator fans.10.Figure 19EVAPORATOR COIL AND SENSOR LOCATION (MODEL

Pagina 4 - CPU BOARD

11.The QC50 has 2 evaporators on the left side of the cabinet along with an evaporator in the ceiling of thecabinet. There are a total of 6 evaporato

Pagina 5 - Figure 10

TROUBLE SHOOTING EVAPORATOR COMPONENTSFAN TERMINATORThe fan terminator is located on the suction line and iscovered by cork tape. The terminator is c

Pagina 6 - RELAY BOARD

DOOR SWITCHThere are up to three types of door switches that were installed on theQuickchillers. The oldest type was installed in the bottom of the t

Pagina 7 - Figure 13

14.Figure 25CONDENSER COMPONENTSRELAY BOARDENCLOSUREOPERATING PRESSURES(R404A) LO 20-25 LBS. @ 38 DEGREES F (AMBIENT: 90 DEGREES F)HI 275-300 LBS.(R2

Pagina 8 - Figure 16

DIAGNOSTIC MENU SCREENAs an aid for repairing or checking the Quickchiller, adiagnostic menu allows the technician to independently enableor disable t

Pagina 9 - PRESSURE SWITCH

16.QC-3 CONTROL SETTINGSPRINTERPrinter Interface = SerialBaud Rate = 4800Stop Bits = 1 bitPrinting Delay = 40 [40]Sample Period, min. = 5 [ 5]Print G

Pagina 10 - Figure 18

17.QC-50 CONTROL SETTINGSPRINTERPrinter Interface = SerialBaud Rate = 4800Stop Bits = 1 bitPrinting Delay = 40 [40]Sample Period, min. = 5 [ 5]Pri

Pagina 11 - Figure 19

SERVICE NOTES18.

Pagina 12 - Figure 20

TROUBLESHOOTING THE QUICKCHILLERThe QuickChiller is a stand alone, high capacity refrigeration system used to rapidly and uniformly lowerthe temperatu

Pagina 13 - DEFROST TERMINATOR

#8421 • 6/01PHONE: (262)251-3800 (800)558-8744 U.S.A./CANADA●Ken Kreuscher, Service Manager●EXTENSION 6425●Mike Hlavenka, Service Support Tech●EXTENS

Pagina 14 - DOOR SWITCH

QUICKCHILLER SET-UPSince all Quickchillers use the same microprocessor, theymust be configured for each specific model. The set-up iscompleted at the

Pagina 15 - CONDENSER COMPONENTS

correct setting. Temperatures that require a negative number canbe entered by using the minus key ”-“ on the keyboard. To exit,press the “D” key and

Pagina 16 - DIAGNOSTIC MENU SCREEN

4.TROUBLE SHOOTING THE CPU BOARDIf the CPU board is suspected as the problem, open the locked CPU access door and verify the greenpower LED is illumin

Pagina 17 - FACTORY SETUP CONFIGURATIONS

RELAY BOARDThe relay board (Figure 11) is mounted in a metal enclosure with a metal or lexan cover over it. For theQC-3 it is located behind the front

Pagina 18

6.There are 16 LED’s on the relay board (Figure 12) that illuminate when that function of the board isenergized and can be used in diagnostics.NOTE: T

Pagina 19 - SERVICE NOTES

Even though the fan LED’s are illuminated on the relay board, theterminator must be satisfied before the fans will operate.NOTE: IF THE EVAPORATOR CO

Pagina 20 - COOK/HOLD/SERVE SYSTEMS

The condenser unit(s) solid state relay(s) are powered by the relayboard through the J6 plug located on the upper right corner of the relayboard (Figu

Comentarios a estos manuales

Sin comentarios